Kitchen

A new kitchen was installed during the month of February 1998.  Actually, it took six weeks to tear-out the old kitchen, prepare the site, and then to install the new kitchen including the appliances.  The work involved stripping the walls bare right down to the studs and removing the first layer of flooring creating a shell in which to start fresh.  The pictures shown below are pretty much descriptive of the before and after condition, although, the after pictures were taken prior to the completion of many details.